Insulated
Been a while since an update. Yep, the boiler is sitting there on the floor quite nicely and waiting to be installed. But FIRST, the walls and the last door have to go in. Progress is being made in that area. The wiring is done all but a tiny bit here and there. Last weekend we got almost all the wall insulation up too! :) There's a bit of framing to finish up on the garage door and some prep to do before hanging the drywall in the ceiling. But it really exciting to have the insulation in and the plactic holding it in! Last Friday I went to ebay and bought a drywall lifter to make hanging the 12 foot sheets as easy as possible, it should be here soon. The drywall got delivered yesterday! (Monday). 26 sheets of 1/2" in 4 X 12 chunks. A few folks have volunteered to help hang it, and I still have to get the 5/8 stuff for around the boiler but it should go pretty fast.
0 Comments:
Post a Comment
<< Home